Modeling the dynamics of production processes in a longwall face based on the application of colored Petri nets
DOI:
https://doi.org/10.33271/crpnmu/86.171Keywords:
reliability, availability factor, machine time factor, stability, Petri netAbstract
Purpose. To develop a novel approach for evaluating the reliability of production processes at the longwall face and determining the topological boundaries for scaling extraction units.
Methodology. Queuing theory was applied to formalize the problem of assessing production process reliability at the longwall face. Colored Petri Nets were utilized to evaluate the dynamics of production processes. The research methodology involved constructing a computational model of equipment interaction with the rock mass, formalizing technological links at the longwall face, and grouping mining-geological and mining-technical factors according to failure rates and their impact on processes inside and outside the longwall face.
Findings. Dynamic reliability metrics were investigated using Colored Petri Nets. It was established that for mines with high adaptability of mining methods, the discrepancy reached 22.7% for the availability factor and 27.6% for the machine time factor. For mines with low adaptability, this deviation was significantly larger: 48.3% for the availability factor and 52.7% for the machine time factor. As reliability increases, the gap between estimated (standard) and actual reliability metrics diminishes. It was determined that for mines with high adaptability of mining methods, increasing the number of longwall faces does not lead to a significant drop in reliability indicators (for the "Heroiv Kosmosu" mine, a decrease in the availability factor of 20.8% and a decrease in the machine time factor of 16.0% were recorded; for the "Lisova" mine, the reductions were 30.4% and 40.9%, respectively). It was established that a critical reliability threshold exists for each topological network, beyond which a cascading decline in the availability factor occurs.
Originality. For the first time, regularities describing how the adaptability level of mining methods affects dynamic reliability metrics across different scales of the longwall mining front have been established, revealing a reduction in the availability factor (by an average factor of 2.1) and the machine time factor (by an average factor of 1.9.
Practical implications. The study of production process dynamics at the longwall face revealed a differentiated impact of topological complexity on mine performance, enabling the recommendation of a minimalist (single longwall) structure for mines with low adaptability levels.
References
1. Bondarenko, V. I., Kovalevska, I. A., Podkopaiev, S. V., Sheka, I. V., & Tsivka, Y. S. (2022). Substantiating arched support made of composite materials (carbon fiber-reinforced plastic) for mine workings in coal mines. IOP Conference Series: Earth and Environmental Science, 1049(1), Article 012026. https://doi.org/10.1088/1755-1315/1049/1/012026
2. Pavlychenko, A., Adamchuk, A., Shustov, O., & Anisimov, O. (2020). Justification of dump parameters in conditions of high water saturation of soils. Technology Audit and Production Reserves, 6(3(56)), 22–26. https://doi.org/10.15587/2706-5448.2020.218139
3. Adamchuk, A., Shustov, O., Panchenko, V., & Slyvenko, M. (2019). Substantiation of the method of determination the open-cast mine final contours taking into account the transport parameters. Collection of Research Papers of the National Mining University, 59, 21–32. https://doi.org/10.33271/crpnmu/59.021
4. Khorolskyi, A., Mamaikin, O., Fomychova, L., Pochepov, V., & Lapko, V. (2022). Developing and implementation a new model optimizing the parameters of coal mines under diversification. ARPN Journal of Engineering and Applied Sciences, 17(16), 1544–1553.
5. Diachuk, O., Kholod, N., Podolets, R., Graham, N., Semeniuk, A., Evans, M., ... Zagoruichyk, A. (2025). Pathways for decarbonization of the buildings sector in Ukraine. Energy and Climate Change, 6, Article 100195. https://doi.org/10.1016/j.egycc.2025.100195
6. Lousada, S., Delehan, S., & Khorolskyi, A. (2024). Application of dynamic programming models for improvement of technological approaches to combat negative water leakage in the underground space. Water, 16(14), Article 1952. https://doi.org/10.3390/w16141952
7. Kolasinski, T. W., Tłuczak, A., & Wigier, M. J. (2025). Perspective on decarbonization in Ukraine: Selected issues. Journal of International Studies, 18(4). https://doi.org/10.14254/2071-8330.2025/18-4/1
8. Bazaluk, O., Petlovanyi, M., Zubko, S., Lozynskyi, V., & Sai, K. (2021). Instability assessment of hanging wall rocks during underground mining of iron ores. Minerals, 11(8), Article 858. https://doi.org/10.3390/min11080858
9. Хорольський, А. О., & Косенко, А. В. (2022). Розробка та реалізація моделі для обґрунту-вання оптимальних технологічних схем відпрацювання викидонебезпечних вугільних пластів. Науковий вісник ДонНТУ, 1(8)–2(9), 193–205. https://doi.org/10.31474/1999-981X-2023-1-97-108
10. Гріньов, В. Г., & Хорольський, А. О. (2020). Визначення раціонального обсягу вилучення корисних копалин із надр: маржинальний підхід. Економіка промисловості, 3(91), 82–95. https://doi.org/10.15407/econindustry2020.03.082
11. Kovalevska, I. A., Bondarenko, V. I., Symanovych, H. A., Sheka, I. V., & Tsivka, Ye. S. (2022). Modeling the rational parameters for innovative fastening systems in mine workings using composite materials. In 15th International Congress on Rock Mechanics and Rock Engineering & 72nd Geomechanics Colloquium – Challenges in Rock Mechanics and Rock Engineering (pp. 1538–1543). CRC Press.
12. Liu, Y., & Ohara, H. (2017). Energy-efficient fluidized bed drying of low-rank coal. Fuel Processing Technology, 155, 200–208. https://doi.org/10.1016/j.fuproc.2016.06.008
13. Shukor, A. A. A., Newaz, M. S., Rahman, M. K., & Taha, A. Z. (2021). Supply chain integration and its impact on supply chain agility and organizational flexibility in manufacturing firms. International Journal of Emerging Markets, 16(8), 1721–1744. https://doi.org/10.1108/IJOEM-04-2020-0418
14. Odeyar, P., Apel, D. B., Hall, R., Zon, B., & Skrzypkowski, K. (2022). A review of reliability and fault analysis methods for heavy equipment and their components used in mining. Energies, 15(17), Article 6263. https://doi.org/10.3390/en15176263
15. Sahiner, S. F., & Golbasi, O. (2026). Mining equipment maintenance and reliability: A systematic review of modelling approaches, solution methods, and applications. International Journal of Mining, Reclamation and Environment, 1–29. https://doi.org/10.1080/17480930.2026.2662304
16. Ugurlu, O. F., & Kumral, M. (2020). Reliability-based performance analysis of mining drilling operations through Markov chain Monte Carlo and mean reverting process simulations. Simulation, 96(7), 593–604. https://doi.org/10.1177/0037549720923751
17. Ozdemir, B., & Kumral, M. (2019). Analysing human effect on the reliability of mining equipment. International Journal of Heavy Vehicle Systems, 26(6), 872–887. https://doi.org/10.1504/IJHVS.2019.102716
18. Rahimdel, M. J., & Ghodrati, B. (2024). Reliability, maintainability, and availability of mining drilling. In Exploring the World of Drilling (p. 151). IntechOpen. https://doi.org/10.5772/intechopen.114938
19. Jakkula, B., Mandela, G. R., & Tripathi, A. K. (2024). Reliability analysis of complex repairable systems using artificial neural networks: A case study on underground mining machinery. Precision Mechanics and Digital Fabrication, 1(4), 189–200. https://doi.org/10.56578/pmdf010401
20. Rahmani, Z., Rahimdel, M. J., & Noferesti, H. (2023). Reliability analysis of a fleet of mining trucks (A case study in Iran). Journal of Geomine, 1(2), 68–74.
21. Jakkula, B., Mandela, G. R., & Tripathi, A. K. (2025). Effective maintenance planning for improving the reliability of underground mining equipment—A case study. Journal of Engineering Management and Systems Engineering, 4(4), 257–268. https://doi.org/10.56578/jemse040403
22. Liu, C., Li, H., Zeng, Q., Lu, T., & Li, C. (2020). Cross‐organization emergency response process mining: An approach based on Petri Nets. Mathematical Problems in Engineering, 2020, Article 8836007. https://doi.org/10.1155/2020/8836007
23. Ozdemir, B., & Kumral, M. (2018). Appraising production targets through agent-based Petri net simulation of material handling systems in open pit mines. Simulation Modelling Practice and Theory, 87, 138–154. https://doi.org/10.1016/j.simpat.2018.06.008
24. Wang, G., Yan, X., Kou, Z., Deng, H., & Wang, K. (2023). Research on operation conflict of auxiliary transport locomotive in complex mine based on extended Petri net. Machines, 11(5), Article 552. https://doi.org/10.3390/machines11050552
25. Li, W. H., & Yan, S. C. (2019). Research on mine locomotive scheduling model and deadlock based on Petri net. In 2019 International Conference on Modeling, Analysis, Simulation Technologies and Applications (MASTA 2019) (pp. 293–299). Atlantis Press. https://doi.org/10.1007/s43674-022-00039-7
26. Yinhui, W., Min, Y., Lijun, D., Keyi, Y., & Ke, G. (2026). Petri net based FPL-FPSN mine ventilation fault diagnosis method. Mining, Metallurgy & Exploration, 1–14. https://doi.org/10.1007/s42461-026-01526-y
27. Li, W., Cao, Q., He, M., & Sun, Y. (2018). Industrial non-routine operation process risk assessment using job safety analysis (JSA) and a revised Petri net. Process Safety and Environmental Protection, 117, 533–538. https://doi.org/10.1016/j.psep.2018.05.029
28. Henry, M. H., Layer, R. M., & Zaret, D. R. (2010). Coupled Petri nets for computer network risk analysis. International Journal of Critical Infrastructure Protection, 3(2), 67–75. https://doi.org/10.1016/j.ijcip.2010.05.002
29. Wang, R., Zheng, W., Liang, C., & Tang, T. (2016). An integrated hazard identification method based on the hierarchical Colored Petri Net. Safety Science, 88, 166–179. https://doi.org/10.1016/j.ssci.2016.05.006
30. Chung, L. P., & Chang, C. T. (2011). Petri-net models for comprehensive hazard analysis of MOCVD processes. Computers & Chemical Engineering, 35(2), 356–371.
31. ВНТП 1-86. Норми технологічного проектування вугільних і сланцевих шахт. (1986). Міністерство вугільної промисловості України.
32. Хорольський, А. О. (2026). Застосування мереж Петрі для оцінки коефіцієнту готовності технологічних схем вугільних шахт. В Потураївські читання – 2026 (с. 52–54). ІГТМ НАН України, НТУ «Дніпровська політехніка».
33. Хорольський, А. О. (2026). Методика визначення коефіцієнту готовності технологічних схем вугільних шахт. In Матеріали XVI Міжнародної науково-технічної конференції аспірантів та молодих вчених «Наукова весна 2026» (с. 413–414). НТУ «Дніпровська політехніка».
34. Гребенкін, С. С., & Агафонов, А. В. (2006). Гірничі машини та комплекси для підземного видобутку вугілля. Монографія. Норд-Прес.
Downloads
Published
Issue
Section
License
All articles are published under the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Authors retain copyright and grant the journal right of first publication.
Authors are permitted and encouraged to deposit the final published version of their article, or the Author's Accepted Manuscript (AAM), in institutional or subject-specific open-access repositories (including the university's own institutional repository, CORE, Zenodo, or Figshare), ensuring maximum visibility, accessibility, and impact of the publication.